
150 to 800 tons · capacity for high-volume serial programs

Designed and manufactured in-house · zero overseas dependency

Automotive-grade regional content · fully documented

Engineering changes executed in 5–10 days, not 4–8 weeks. Emergency tool repairs in under 48 hours — even for tools originally made by another supplier.

Full automotive documentation and traceability applied to every program, regardless of the industry. Same discipline for automotive, appliances, HVAC, and electrical.

Design → tool build → stamping → robotic welding → assembly → checking fixtures. No sub-contractors in your critical path. No handoffs.

Arteaga, Coahuila — the industrial heart of Mexico's automotive corridor. Direct truck shipping to Detroit, Auburn Hills, Toledo, Indianapolis, and Georgetown in 3–5 days.

Send drawings, specifications, and volume estimates through our form. Include your material, tolerance, and expected SOP date.

Our engineering team reviews your requirements and confirms manufacturing viability within 2 business days.

Full costing with tooling amortization, unit price, PPAP timeline, and delivery terms.

SOP with PPAP Level 3 documentation. 24/7 tooling emergency response. Continuous PPAP maintenance for the life of your program.